Process & quality

Quality is built through
control across the system

This eight-stage path explains the overall control structure. It does not state project-specific tests, timing, or acceptance criteria; those are confirmed for each project.

Mixing equipment in the Beauty ETC production area
Mixing equipment in the real production environment
Control pathway

From idea to delivery readiness

This is a product-control map, not a promise of the customer-facing sequence or timing for every project.

01

Idea & Brief

Frame the concept, target customer, desired attributes, and initial project constraints.

  • Concept
  • Target
  • Product goal
02

Research & Development

Develop a formula, texture, and ingredient direction aligned with the brief and available information.

  • Formulation
  • Texture
  • Active direction
03

Stability & Safety

Assess stability, microbiological, and safety directions according to the confirmed project scope.

  • Stability
  • Microbial
  • Safety
04

Regulatory Review

Review formula information, label content, and relevant regulatory considerations within the project scope.

  • Formula
  • Label
  • Regulatory
05

Raw Material & Packaging QC

Review incoming material and packaging information, quality, and relevant compatibility factors.

  • Quality
  • COA
  • Compatibility
06

Production & Process Control

Carry out weighing, mixing, and defined process-control points for the project.

  • Weighing
  • Mixing
  • Process control
07

Filling & Final QC

Fill the product, complete defined inspections, and review readiness before release.

  • Filling
  • Inspection
  • Release review
08

Release & Delivery

Release against defined information and criteria, then prepare delivery according to the project plan.

  • Quality checked
  • Released
  • Ready to deliver
Customer journey

A different view from the control pathway

This shows the customer's broad participation points. Development rounds, approvals, and timing vary by project.

A

Share the idea

Share the product type, audience, and initial expectations.

B

Align the brief

Review scope, feasibility, and information needed for the next step.

C

Develop & confirm

Proceed within the agreed scope, with review and confirmation points.

D

Plan & deliver

Confirm readiness, production planning, and delivery conditions.

Inside the real process

Evidence from weighing, packing, and inspection

Material weighing and preparation area with scales
Material weighing and preparation
Entrance to the Beauty ETC chemical weighing room
Dedicated chemical weighing room
Team labeling and inspecting products on the packing line
Product labeling and inspection
Team packing night cream products in the production area
Product packing by the production team
Night cream boxes arranged on the production line
Boxed products on the production line
VERIFIED CERTIFICATION

Cosmetics Good Manufacturing Practice

This certificate was issued by the Food and Drug Administration, Ministry of Public Health for the manufacturing site of BEAUTY ETC CO., LTD.

THAI FDAGMP
Operator
BEAUTY ETC CO., LTD.
Certificate no.
1-5-04-17-26-0001
Issued
19 January 2026
Valid until
18 January 2029
Manufacturing site
111/155 Moo 5, Wat Chalo Sub-District, Bang Kruai District, Nonthaburi 11130, Thailand

Details are reproduced from the supplied GMP certificate without extending the scope to other standards.

Discuss the actual brief